Fitting Process |
| Old timber is removed to expose
rafter feet / batons for inspection and treatment if required,
preventing further deterioration. |
 |
 |
| Old drip apron is checked for
condition and replaced with new, PVCU membrane as required.
Projects with peg tiles or slate roofs usually do not need
drip aprons, however, as an added precaution, APC Cladding
will always endeavour to fit one if possible to these rooflines. |
|
| |
Rafters are plumb tied and
packers fitted to re-level roofline, prior to fitting new
boards. |
 |
| The finished Fascia, Sofit,
Guttering profile soffits can be either flat or tongue grooved
at the customers discretion. Advice will be given. |
 |
|
Gables |
| How it should NOT look. |
| |
| How it looks after APC Cladding has finished. The construction
of the boxends is a specialisation of APC Cladding. |
| |
Ventilation |
if a property requires roofline ventilation (because of problems
or building regulations), this will be fitted at no extra cost.
Advice is always offered.
A more comprehensive explanation of all the previous procedures
is covered at point of survey.
|
| |
|
"We do it once, we do it for life"
|
TM |
|
|